建筑装饰工程施工合同
Contract
发包方(简称甲方)
Party A:

承包方(简称乙方):上海巧点装饰设计有限公司
Party B: i-point design (Inspiration Point Design)

根据<中华人民共和国合同法><中华人民共和国消费者权益保护法><中华人民共和国价格法><上海市合同格式条款监督条例>,<上海市建筑市场管理条例>,以及其他有关法律法规规定的原则,结合本工程的具体情况,甲、乙双方在平等、自愿、协商一致的基础上达成如下协议,共同遵守
According to: “PRC Contract Law”, “Law on the Protection of Consumer Interests”, “PRC Price Law”, “Shanghai Supervision of Contract Terms”, “Shanghai Construction Market Management Regulations”, as well as other laws and regulations relevant to the specific circumstances of this project, parties A and B have hereby equally and voluntarily entered into the following agreement executed on the basis of mutual respect.

一、概况
OVERVIEW
1. 甲方装饰物业系合法物业
Party A is the owner of the property.
2. 乙方为本市经工商行政管理机关核准登记,并可从事装潢装修的企业
Party B is approved and registered with the city industrial and commercial administrative organs as an
enterprise engaged in renovation and decoration.
3. 装饰施工地点
Construction site:
4. 建筑结构: 建筑面积 平方米,施工面积 平方米。
Construction area: total area (including stairwells and other common areas): m2, private living area: m2.
5. 装饰施工内容:住宅装饰,详见附件一<工程估价单>
Structure: residential.
6. 承包方式:详见附件一<工程估价单>
Contractor engagement method: See annex ? (quotation).
7. 总价款: .00元,大写(人民币): 元整。
Total price: .00RMB; in words: 元整. Any changes in this price must be agreed by both parties in writing.
8. 工期:自 年 月 日开工,至 年 月 日前竣工,工时总计 天,不含国家法定节假日,乙方委派现场施工监理为 先生,联系方式:
Period: Start: (year) (month) (day); Completion before: (year) (month) (day); Total days (excluding national holidays): days. Party B’s on site construction supervisor will be:
二、关于工程付款及结算的约定
TERMS OF PAYMENT
1. 工程款的付款方式如下
The payment schedule shall be as follows:

付 款 时 间
Timing of Payments
付 款 时 间
Date (yyyy.mm.dd)
Amount (RMB)

合同签订后60%
After the contract is signed.




油漆工进场前30%
When half of the project period time has elapsed.




家具、灯具进场前5%
Furniture of lamps and lanterns, before the approach




验收合格后,五天内5%
Upon Acceptance of
the completion of the project.




增加工程项目100%
Project changes.
签订工程项目变更单100%
Date of signing for the project change.



空调工程项目100%
Air conditioning project




家具工程项目100%
Furniture engineering





三、关于材料供应的约定
AGREEMENT ON THE SUPPLY OF MATERIALS
1. 乙方提供的材料:乙方供应的材料、设备,如不符合设计、施工要求,应禁止使用。如已使用,对工程造成的损失由乙方负责。如甲方要另增加材料由甲方供应,并应符合下列规定:
Material provided by Party B: Any materials or equipment supplied by Party B which do not meet the design and construction requirements are prohibited. Any extra materials requested by Party A which were not in the original design must be paid for by Party A.
2. 甲方提供的材料:另拟补充附件<甲方提供材料、设备表> 甲方负责采购供应的材料、设备,应符合设计施工要求的合格产品,并应按时供应到现场。乙方发现甲方提供的材料、设备有质量问题或规格差异,应及时向甲方提出,甲方仍要求使用的,由此造成工程损失,责任由甲方承担。甲方供应的材料按时抵达现场后,由乙方负责保管
Material provided by Party A: (see the annex: “Table of Materials to be provided by the Owner”). If Party A acquires materials for the project, it should first check with Party B that the materials match to the design requirements, and once the materials are in the care of Party B, then Party B is responsible for the materials. If Party A requires some materials which do not fit to the design then it shall be the responsibility of Party A to pay any additional costs incurred by Party B.
四、关于工程质量及验收的约定
FULFILMENT OF THIS AGREEMENT
1. 本工程应符合<建筑装饰工程技术规程>和市建设行政主管部门制定的其它地方标准\质量评定验收标准
The execution of this project must be consistent with the “Architectural and Engineering Rules” of the city administrative departments responsible for the development of buildings and local standards and quality evaluation acceptance criteria.
2. 本工程由乙方进行设计,提供施工图纸一式两份,双方签字确认
Party B must provide a duplicate copy of the construction designs and drawings, and both copies should be signed by both parties.
3. 甲方提供的材料、设备质量不合格而影响工程质量,其返工费用由甲方承担,工期相应顺延
If materials provided by Party A for the construction do not meet the necessary requirements, Party A shall bear responsibility for any resulting delays in the completion in the project.
4. 由于乙方原因造成质量事故,其返工费用由乙方承担
If the quality of Party B’s work results in any accidents, the liability for such accidents shall be the responsibility of Party B.
5. 在施工过程中,甲方提出设计修改意见及增减工程项目,须提前与乙方联系,在双方签订<工程项目变更单>后,方能进行该项目的施工、因此影响工程竣工日期的,责任由甲方承担。凡甲方私自与施工人员商定更改施工内容、增加施工项目所引起的一切后果,甲方自负,给乙方造成损失的,甲方应予赔偿
If, during the construction, Party A wishes to propose a change to the design, he should sign a “Change of Project” with Party B and must assume responsibility for resulting delays or increas
… …
正文预览结束,更多内容请下载文档查看。

英文版建筑装饰工程施工合同 图文预览

(本文档内容为英文版建筑装饰工程施工合同,页数为4, 图文预览仅显示文档前十页。 文档中主体文字及图片可替换修改,可以根据自身需求增加和删除作品中的内容, 欢迎使用枫哥办公学习网。)

温馨提示:
1,最低19元升级会员,免费下载本站全部模板资料,点击查看详情
2,资料失效或者不对版?点击售后服务
3,本站没有您要的资料?我们帮您找:点击留言找资料

合同协议模板大全 » 英文版建筑装饰工程施工合同

怎样下载资料更省钱?

立即查看 留言找资料